15 May Our Projects: NPI Stage 2 Pipeline
NPI Stage 2 Pipeline
Sunshine Coast, Qld
The NPI Stage 2 pipeline project connects from the stage 1 treatment point at Lander’s shute Water treatment plant (Eudlo) and extend to the Noosa Water Treatment near Cooroy. The project consists of approximately 48 kilometres of bi-directional pipeline and associated facilities. The project footprint is approximate 148 hectares, comprised of a 30 metre wide pipeline corridor plus associated facilities of four pump stations, one balancing tank and two water quality facilities.
Services Provided:
• Subsurface Utility Locating
• Hydro Vacuum Excavation (NDD)
Client: McConnel Dowel, Abigroup, KBR Joint Venture
Completed: 2009